Harbour Development
The following page provides links to electronic copies of reports which have commissioned or undertaken by DHT concerning the management of the harbour, the environment and built heritage of the l harbour area and projects which are being planned. Further reports will be added over time as and when they are available in electronic format.
- Beckett Rankin Harbour Survey 04/2009 ( 5MB) (updated 5 June 2009)
- AMBIOS Dunbar Harbour Bathymetric Surface and Subsurface Geology Report 01/2009
- DHT Harbour Development Discussion Paper Final 05/2008
- Beckett Rankin Harbour Survey and Recommendations 09/2007
- RNLI Additional Site Investigations report 06/2006
- RNLI Report on Rock Dredging 08/1995
- HR Wallingford Wave Attenuation and Harbour Options Report 05/2002
